Skip to content

Pull requests: openshift/sriov-network-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Merge https://github.com/k8snetworkplumbingwg/sriov-network-operator:master into main approved Indicates a PR has been approved by an approver from all required OWNERS files.
#1190 opened Apr 16, 2026 by SchSeba Contributor Loading…
TEST approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#1188 opened Apr 15, 2026 by SchSeba Contributor Loading…
Add Nvidia ConnectX-6 Lx and ConnectX-8 to supported NIC list approved Indicates a PR has been approved by an approver from all required OWNERS files. verified Signifies that the PR passed pre-merge verification criteria
#1183 opened Apr 3, 2026 by zhiqiangf Loading…
2 tasks
[release-4.21]: fix: add timeout to sysfs writes to prevent daemon hang approved Indicates a PR has been approved by an approver from all required OWNERS files.
#1182 opened Mar 24, 2026 by zeeke Contributor Loading…
Enable OLM AllNamespace install mode approved Indicates a PR has been approved by an approver from all required OWNERS files.
#1181 opened Mar 24, 2026 by zeeke Contributor Loading…
OCPBUGS-78148: [release-4.21] block device plugin until SR-IOV config applied approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. verified Signifies that the PR passed pre-merge verification criteria
#1178 opened Mar 10, 2026 by zeeke Contributor Loading…
ProTip! Updated in the last three days: updated:>2026-04-14.