  • Phase 3 is the final phase before publishing the main network. This includes creating final public documentation, performance testing and optimisation and security testing including an audit. The nature of the audit will be determined at this time, whether it's an official commercial audit or a community led audit.

    Due by November 6, 2025
    11/11 issues closed
  • Phase 2 covers a period of integration and testing, ensuring all the crates integrate and work reliably together. This phase also includes running a public test network to allow the community to play a part in testing.

    Due by October 2, 2025
    18/18 issues closed
  • Phase 1 is the development of the complete node code base to the point of being able to spin up a network with genesis block, adding and removing nodes and deploying smart contracts with a complete working consensus mechanism as set out in the consensus paper.

    Due by August 18, 2025
    86/86 issues closed